QUIKDECK by Dynamic

QuikDeck from Safeway

Brought to you by Dynamic Access

QuikDeck® makes the work safer, easier and more efficient.

The QuikDeck Suspended Access System offers the advantage of safely working on an open, modular platform. With basic components and a flexible composition, QuikDeck’s patented configuration can adapt to fit almost any shape or size.

Revolutionary Suspended Access – the QuikDeck Suspended Access System easily and safely provides complete access to many of those hard-to-reach places on an offshore rig.

Perfect for the underside of a platform, QuikDeck can be assembled and lowered into position or built in the air.

QuikDeck is an innovative difficult access solution that has been utilized on offshore rigs across the world, and because of its ease of use and efficiency, QuikDeck can significantly reduce your project’s overall cost.

^

BENEFITS OF QUIKDECK

  • Components can be easily handled by one person
  • Requires no special tools or skills to assemble
  • Load capacities range from 25 psf to more than 75 psf
  • Can be built in the air or on the ground and then hoisted into position
  • Equipment can be leapfrogged and relocated as work progresses

Dynamic Access

51 Shepherd Street,
Marrickville NSW 2204

Contact Us

admin@dynamicaccess.com.au
(02) 9046 8475

Office Hours

Mon-Fri 8:00 am – 5:00 pm
Sat-Sun 8:00 am – 12:00 nn

QUIKDECK HAS MULTIPLE SECTOR APPLICATIONS

The QuikDeck® Suspended Access System meets or exceeds federal safety and health requirements and has a 4-to-1 factor of safety.

Specialised QuikDeck® Applications:

Bridges – New construction, structural rehabilitation, painting, maintenance and repair

Offshore – Under platform painting and pipe racks

Shipyards – Interior and exterior painting and maintenance

Atriums – HVAC installation, lighting, painting

Temporary Stages – Events and walkways

Boilers – Construction and maintenance

Industrial – Pipe racks, painting and repair

Using our QuikDeck® Suspended Access System, BrandSafway slashed 12 days off a boiler shutdown.

QuikDeck® eliminates the time needed to build scaffold from the bottom up, while enabling multiple trades to work on various levels and side-by-side on a safe, suspended floor. Benefits like these helped us put a Michigan boiler project more than a week and a half ahead of schedule. Find out how QuikDeck can reduce timelines and maximize efficiency, so you can complete your next project faster, safer and better.

 

Innovation At Work For You

Get a competitive advantage today

Get in touch for a customised solution

SEND US AN ENQUIRY

_

8 + 5 =